Stromag Modifies Periflex CR Shaft Coupling for Dredging System

first_imgStromag engineering team recently designed a hybrid Periflex CR (PCR) shaft coupling for a manufacturer of dredging systems who needed a reliable coupling solution with a small footprint for use on a new dredging vessel platform. “The system features a 1200 HP diesel engine that drives a complex, custom-designed, eight-pad gearbox with primary output to a two-speed clutch that drives the system’s main pump, as well as hydraulic pump pads to operate a crane and auxiliaries,” the Germany based developer and manufacturer of power transmission components said in its release.The modified PCR coupling utilized a rubber element from a similar Stromag model PCS coupling and a bolt-on adaptor hub with a splined bore.Extensive torsional vibration analysis (TVA) work was completed on this complex multi-stream system of 9 driven components as the coupling was sized to fit within the tight space constraints of the customer’s gearbox bell housing.The coupling’s flexible ring effectively absorbs torsional impacts.last_img read more

Edo Gov to Refurbish Ogbemudia Stadium Facilities

first_imgAdibe Emenyonu in Benin CityEdo State Governor, Mr. Godwin Obaseki, has indicated the readiness of his administration to refurbish facilities damaged by the last rainstorm at the Samuel Ogbemudia Stadium. He disclosed this during an inspection tour of the damaged facilities at the stadium in Benin City, the Edo State capital, where he also note revealed that some of such facilities would be overhauled and upgraded.The governor, who was taken round the damaged facilities by the Assistant Director of sports Facilities, Victor Edokpayi, said the inspection became necessary following the damage to some facilities at the stadium to strategise on how the facilities could be fixed.“We are here to inspect the damage done to some facilities. We can see some of the rooftops blown off by the rainstorm. The rooftop of the swimming pool and the gymnasium were totally blown off. The facilities here need total overhauling,” he noted.Governor Obaseki, accompanied by his deputy, Hon. Phillip Shaibu and the SSG, Osarodion Ogie, said his administration would refurbish the facilities in the stadium particularly the swimming pool section and some other damaged sections such as the judo hall and indoor sports complex that were damaged by the rainstorm.He said the facilities in the stadium needed to be improved upon to get more of the younger ones interested and involved in sporting activities.On the duration of the refurbishment, the governor disclosed that a consultant would be invited immediately to carry out an assessment and evaluation of the damage to the facilities, after which the project would take off.Share this:FacebookRedditTwitterPrintPinterestEmailWhatsAppSkypeLinkedInTumblrPocketTelegramlast_img read more